Prerequisite Requirements for Diploma Print E-mail

Country Energy has reported that their Design Officers are prevented from achieving the following units of competency in the Diploma:

 

  UETTDRSO5A

Design overhead distribution systems
  UETTDRSO6A

Design underground distribution system

  UETTDRSO7A

Design distribution substations

  UETTDRSO8A

Design Public Lighting systems


The prerequisite requirement to achieve these units of competency are both UETTDRDS13A Develop HV and LV distribution protection systems and UETTDRDS15A Organise and implement line and easement surveys.

 

The suggestion is that rather than both units being required that a "or" situation is put in place where either one of the units is required as the prerequisite.